307-442-0382
Home of “The Feeder Bucket King”
MCC Depot - The Feeder Bucket King

CALL OR TEXT Mon-Fri 8-5 ET

MCC Field Services

Request a site-work review for MCC installation, equipment surveys, bucket replacement, retrofit support, troubleshooting, or planned maintenance. Availability, location, scope, personnel, and schedule are confirmed in the written proposal.

Discuss Your Field-Service Request

Call or text 307-442-0382 during Mon-Fri 8-5 ET, or email the job details and equipment photos.

Field-Service Scope

RequestTypical Scope InputsPossible Deliverables
Equipment surveyLineup, nameplates, condition, missing data, access, and outage limitsPhoto record, dimensions, equipment list, and quotation inputs
Installation supportApproved drawings, equipment, site safety rules, rigging, power/control work, and startup planDefined installation, checkout, or commissioning tasks
Bucket replacement / retrofitExisting bucket, new scope, ratings, controls, outage, and site responsibilitiesRemoval/installation tasks, wiring changes, checks, and documentation as quoted
Troubleshooting reviewFailure description, current condition, drawings, photos, alarms, and production impactRemote review, parts/bucket path, or proposed site visit
Planned inspectionEquipment list, maintenance standard, test requirements, outage, and reporting formatInspection or testing scope specifically listed in the proposal

Information Needed

  • Facility location and site contact.
  • MCC manufacturer, model, voltage, and lineup photos.
  • Requested work and the condition prompting it.
  • Outage window, access, badging, training, and safety requirements.
  • One-line, schematics, equipment schedule, and prior reports when available.
  • Requested date and any fixed production deadline.

Scope Notes

  • No response time, travel coverage, certification, or staffing is assumed until MCC Depot confirms it in writing.
  • Testing, studies, engineering stamps, permits, rigging, materials, and after-hours work are included only when listed in the proposal.
  • Site work must follow the facility safety program and be performed by qualified personnel.
Engineering support information

Request Field Service

Email the facility location, MCC manufacturer and model, requested work, outage window, and available photos or drawings. MCC Depot will review the request and contact you about availability and next steps.